Lise at NHR@ZIB
Latest News
Upcoming partial maintenance starting Friday 24th May
Maintenance work on the power infrastructure is required for the installation of the new GENOA partition:
- For the maintenance, CPU racks 11-14 (bcn[1961-2236], bfn[1001-1032], and bsn[1001-1002]), and the A100 and PVC partitions need to be shut down temporarily.
- Due to technical limitations, CPU racks 1-3 (bcn[1001-1288]) will also be shut down, but permanently.