Zum Ende der Metadaten springen
Zum Anfang der Metadaten

Sie zeigen eine alte Version dieser Seite an. Zeigen Sie die aktuelle Version an.

Unterschiede anzeigen Seitenhistorie anzeigen

« Vorherige Version anzeigen Version 345 Nächste Version anzeigen »

Lise at NHR@ZIB

Latest News


Partial maintenance starting Friday 24th May

update May 24th

Maintenance on the power distribution is finished. All partitions are available again.
The Lise node count is reduced by 288 nodes to free up power reserves for the soon available AMD Genoa partition.

original message

Maintenance work on the power infrastructure is required for the installation of the new GENOA partition:

  1. For the maintenance, CPU racks 11-14 (bcn[1961-2236], bfn[1001-1032], and bsn[1001-1002]), and the A100 and PVC partitions need to be shut down temporarily.
  2. Due to technical limitations, CPU racks 1-3 (bcn[1001-1288]) will also be shut down, but permanently.


  • Keine Stichwörter